Overland Bridge Replacement (I-95)

Executive Summary
Award-Winning Overland Bridge: Built-Safe Delivery Support on a Long-Running Mega Corridor.
Project Synopsis
Public scope: FDOT's Overland Bridge work is documented as a major I-95 corridor capacity and interchange improvement program; external engineering documentation cites $160M and awards including FTBA Best in Construction Major Bridge and ACEC-FL/FDOT Outstanding Project Award, with performance dates 2012-2018. Other public reporting cites a higher estimate (e.g., $227M), so cost is best treated as a range absent a single authoritative cost ledger in the sources reviewed.
STEARZ Service Summary
STEARZ service summary: STEARZ's overviews indicate CEI involvement (and, in a related EAR document, engineering analysis/report support) during work on this corridor, via primes including AMEC and a contractor support channel. Unspecified: the exact Overland sub-segment(s) covered and whether STEARZ scope included bridge deck/post-tension inspection, MOT staging reviews, or materials QA beyond CEI checklists.
Services Delivered
CEI support on major bridge/interchange work
Engineering analysis/report assistance (where required)
QA documentation and public-trust record discipline

